Floor joists on one side going in. There was huge trauma when the wall plate ( that horizontal bitty of wood) wouldn't line up with the holes in the concrete which it had to be fixed down to ( very secure in case of a force 10 off the Bay) but all is now well.
Work starts at 7a.m and goes on till 10, then 7 - 9 in the evening. And long may the dry weather last.
No comments:
Post a Comment